TEL +49 23 03.9 61 23-0

Biogas

back
4_1_1_Zentralgeruehrte_Fermenter_Referenz_1_Detail1
4_1_1_Zentralgeruehrte_Fermenter_Referenz_1_Detail2
4_1_1_Zentralgeruehrte_Fermenter_Referenz_1_Detail3
4_1_1_Zentralgeruehrte_Fermenter_Referenz_1_Detail4
4_1_1_Zentralgeruehrte_Fermenter_Referenz_1_Detail5

Energiepark Trelder Berg

Place of construction:21244 Buchholz i.d. Nordheide, Germany
Year of construction:2006 / 20103 Pre-storage tanksDiameter: 11.09 m 

Height: 11.93 m 

Volume: 1,150 m³ each 

Tank equipment: with central agitator6 FermentersDiameter: 17.07 m

Height: 16.87 m

Volume: 3,860 m³ each 

Tank equipment: with central agitator3 Secondary fermentersDiameter: 17.07 m

Height: 8.47 m

Volume: 1,940 m³ each 

Tank equipment: with attached gas depot, volume 1,300 m³Digestate depotDiameter: 17.92 m

Height: 7.07 m

Volume: 1,780 m³

Tank equipment: with emission control roofDigestate depotDiameter: 12.80 m

Height: 7.07 m

Volume: 910 m³

Tank equipment: with emission control roofDigestate depot (2010)Diameter: 31.58 m

Height: 11.27 m

Volume: 8,820 m³

Tank equipment: with emission control roof