TEL +49 23 03.9 61 23-0

Biogas

back
4_1_1_Zentralgeruehrte_Fermenter_Referenz_4_Detail1
4_1_1_Zentralgeruehrte_Fermenter_Referenz_4_Detail2
4_1_1_Zentralgeruehrte_Fermenter_Referenz_4_Detail3
4_1_1_Zentralgeruehrte_Fermenter_Referenz_4_Detail4
4_1_1_Zentralgeruehrte_Fermenter_Referenz_4_Detail5

Josef Wenning

Place of construction:46414 Bocholt-Rhede, GermanyYear of construction:1980-2012Fermenter (1980)Diameter: 9.39 m

Height: 8.47 m

Volume: 650 m³Unpressurised gas depotDiameter: 9.39 m

Height: 8.47 m

Volume: 650 m³1 Secondary fermenter (1997)Diameter: 20.49 m

Height: 5.67 m

Volume: 1,870 m³

Tank equipment: with gas-tight plastic sheeting – dismantled 2012Fermenter (2007)Diameter: 16.22 m

Height: 15.47 m

Volume: 3,200 m³

Tank equipment: with central agitatorFermenter (2011)Diameter: 22.19 m

Height: 15.47 m

Volume: 5,980 m³

Tank equipment: with central agitatorFermenter (2012)Diameter: 20.49 m

Height: 15.47 m

Volume: 5,100 m³

Tank equipment: with central agitator