TEL +49 23 03.9 61 23-0

Biogas

back
4_1_2_Fermenter_Nachgaerer_Referenz_2_Detail_1
4_1_2_Fermenter_Nachgaerer_Referenz_2_Detail_2
4_1_2_Fermenter_Nachgaerer_Referenz_2_Detail_3
4_1_2_Fermenter_Nachgaerer_Referenz_2_Detail_4
4_1_2_Fermenter_Nachgaerer_Referenz_2_Detail_5

BGA Körner

Place of construction:46499 Hamminkeln, GermanyYear of construction:2010Buffer tankDiameter: 11.95 m

Height: 4.27 m

Volume: 480 m³

Tank equipment: with emission control roofFermenterDiameter: 19.63 m

Height: 7.07 m

Volume: 2,140 m³

Tank equipment: with attached gas depot, volume: 1,000 m³Digestate depotDiameter: 32.43 m

Height: 7.07 m

Volume: 5,840 m³

Tank equipment: with attached gas depot, volume: 2,000 m³Beet storageDiameter: 25.60 m 

Height: 7.07 m

Volume: 3,640 m³