TEL +49 23 03.9 61 23-0

Low pressure gas depot

back
Mainz

Place of construction: Zentralklärwerk MainzYear of construction:2015Low pressure gas depotDiameter: 19.63 m

Height: 14.77 m

Volume: 3,700 m³

Design pressure: 55 mbarLow pressure gas depotDiameter: 17.93 m

Height: 11.97 m

Volume: 2,500 m³

Design pressure: 55 mbar

Scope: planning, statics, delivery, assembly and commissioning

Special features: automatic parallel operation through spring loading, supply of flare, foreshaft equipment and other gas-technical components